Edwards Moving & Rigging was awarded the transport of three (3) turbines from the manufacturer to a new combined cycle power plant in the Northeast US. Watch how our A-500 Dual Lane Expandable Transporter easily moves the first turbine over a multi-state 230 mile route.
Watch our Goldhofer ADDrive power this 375,000 lb. turbine up a 11% incline in the mountainous northeast US to the job site and then maneuver on site for offload placement.